DATA CENTER
Our ready-to-install precast systems accelerate large-scale data center construction by reducing installation time, minimizing risk and keeping projects on schedule.
MEETING THE DEMANDS OF DATA CENTER CONSTRUCTION
EZ-KEY™ Precast Duct Banks
Arrive ready to install, helping contractors eliminate delays, control labor costs and make progress with precast.
EZ-KEY Precast Vaults
Provide streamlined utility connections to help fast-track underground power and communication systems.
Drainage Products
Deliver reliable, long-term site-water management.
Custom-Engineered Precast Solutions
Designed to meet the demands of complex data center builds.
A BETTER WAY TO BUILD UNDERGROUND INFRASTRUCTURE
Advantages of Precast vs. Cast-in-Place
| Cast-In-Place Duct Bank | EZ-KEY™ Precast Duct Bank | |
| Installation Time | 100-200 ft/day | 600-1,200 ft/day |
| Labor Requirements | 10-20 workers, 1 operator | 3 workers, 1 operator |
| Cure Time | 3-7 days | None (pick & save) |
| Schedule Impact | High exposure to weather, vendor and site delays | Predictable timeline with minimal disruption |
| Quality Assurance | As-built consistency | Manufactured in controlled environments |
| Safety | Extended open trench time | Backfill same day as install, less on-site crew |
| Scalability | Difficult to standardize across large footprints | Ideal for large runs across hyperscale sites |
Delivered. Set. Locked. Done.
- Our EZ-KEY™ system is designed to simplify alignment, eliminate guesswork and keep projects on track—even in the face of weather delays, labor shortages and tight schedules.
10 FEET
IN 2 MINS.
10-foot sections
installed in 2 minutes.
55,000-LB.
LOAD CAPACITY
handles up to
3x industry standards.
ZERO
CURING
routing or grouting.
No extra steps needed.
Project Spotlight:
Data center installation
The Roman Stone EZ-KEY™ system was demonstrated in a live data center environment to show how precast duct banks improve speed, efficiency and overall execution.
- Faster installs
- Cleaner execution
- Proven in the field
SUPPORTS SUSTAINABLE
CONSTRUCTION
Coming Soon:
Low-Carbon Mix
The entire EZ-KEY line will be available with a carbon-negative concrete mix to support sustainability goals without impacting performance.
No Steel
Rebar Required
EZ-KEY duct banks use basalt fiber reinforcement to eliminate traditional steel rebar, reducing material complexity while maintaining strength and durability.